See the quality of proposals QuoteSmith generates. Every example below was created using our AI — the same tool you'll have access to.

General Builder Plumber Electrician

Single Storey Kitchen Extension

General Builder £30,000.00

Wilson Builders Ltd

14 Oak Lane, London SE1 4RT
020 7946 0123
info@wilsonbuilders.co.uk

PROPOSAL

Ref: QS-260215-001   Date: 15 February 2026

Client Details

Name: Mr James Thompson Email: james@email.com Phone: 07700 900123 Address: 22 Maple Drive, Croydon CR0 5TH

Scope of Work

We are pleased to present this proposal for the construction of a single storey rear kitchen extension at the above property, measuring approximately 4 metres by 3 metres. The project will commence with the careful demolition of the existing rear wall and removal of all arising materials from site. We will then excavate and pour new concrete strip foundations in accordance with current Building Regulations, with depths subject to approval by Building Control upon inspection. Blockwork cavity walls will be raised to plate level, incorporating cavity wall insulation, damp proof courses, and wall ties as required. A structural steel beam (RSJ) will be installed to form the opening between the existing property and the new extension, with all structural calculations provided by our appointed engineer and submitted to Building Control for approval.

The extension will feature a warm flat roof construction with a single-ply membrane finish, incorporating a large rectangular skylight to flood the new kitchen space with natural light. The rear elevation will include a set of aluminium bi-fold doors (approximately 3 metres wide) opening onto the garden. Internally, all walls and ceilings will be plastered to a smooth finish ready for decoration. The electrical installation will include 5 new double sockets positioned to suit the proposed kitchen layout, 4 recessed LED downlights, and all wiring back to the existing consumer unit. Plumbing works will comprise hot and cold supply pipework and waste connections for the new kitchen sink, tied into the existing drainage system. All work will be left clean and ready for the client's own kitchen fitter to install units — the supply and fitting of kitchen units is excluded from this proposal. Final making good to all disturbed internal and external areas is included.

Cost Breakdown

Description Qty Unit Price Total
Groundworks & Foundations 1 £4,500.00 £4,500.00
Structural Steelwork & Blockwork 1 £6,200.00 £6,200.00
Roofing, Windows & Bi-fold Doors 1 £8,500.00 £8,500.00
Electrics, Plumbing & Plastering 1 £5,800.00 £5,800.00
Subtotal: £25,000.00
VAT (20%): £5,000.00
Total: £30,000.00

Estimated Timeline

The project is estimated to take 6–8 weeks from commencement, subject to weather conditions and Building Control inspection timescales. A provisional week-by-week programme is as follows: Week 1 — Site set-up, demolition of existing rear wall, excavation of foundation trenches. Week 2 — Concrete foundations poured, drainage connections, oversite preparation. Week 3 — Blockwork walls raised to plate level, structural steel installed. Week 4 — Roof construction, membrane applied, skylight fitted. Weeks 5–6 — Bi-fold doors installed, first fix electrics and plumbing, insulation. Weeks 6–7 — Plastering, second fix electrics and plumbing, floor screed. Week 8 — Making good, snagging, final Building Control inspection, handover. Please note this programme is indicative and may be adjusted during the works. We will keep you informed of progress at each stage.

Terms & Conditions

Payment Schedule: 10% deposit upon acceptance of this proposal to secure your place in our schedule. 25% upon commencement of works on site. 30% upon completion of the roof structure (watertight stage). 25% upon completion of first fix electrics and plumbing. 10% final payment upon satisfactory completion and handover. All invoices are payable within 7 days of issue by bank transfer.

Warranty: All workmanship carried out by Wilson Builders Ltd is covered by a 12-month defects liability period commencing from the date of practical completion. This covers any defects arising from faulty workmanship or materials supplied by us. It does not cover damage caused by third parties, client-supplied materials, or normal wear and tear.

Validity: This proposal is valid for 30 days from the date shown above. After this period, prices may be subject to revision due to changes in material costs or availability. Any variations to the agreed scope of work will be priced separately and agreed in writing before proceeding.

Full Bathroom Renovation

Plumber £10,200.00

AquaFlow Plumbing

8 River Close, Manchester M1 2AB
0161 496 0800
hello@aquaflow.co.uk

PROPOSAL

Ref: QS-260218-042   Date: 18 February 2026

Client Details

Name: Mrs Sarah Mitchell Email: sarah.m@email.com Phone: 07555 123456 Address: 9 Birch Avenue, Stockport SK3 8PQ

Scope of Work

We propose a complete strip-out and renovation of the family bathroom at the above property, measuring approximately 2.8 metres by 2.2 metres. The existing bathroom suite, wall and floor tiles, and flooring will be carefully removed and disposed of responsibly. All waste and supply pipework will be reconfigured to accommodate the new layout. We will supply and install a new P-shaped shower bath with a curved glass shower screen, a close-coupled toilet with soft-close seat, a wall-hung vanity unit with integrated basin and mixer tap, and a chrome heated towel rail connected to the central heating system. All plumbing connections will be completed to a high standard using push-fit and compression fittings, with full testing for leaks before tiling commences.

The walls will receive full floor-to-ceiling tiling using client-selected tiles (tile cost included in our allowance up to £30 per square metre — any excess to be agreed). The floor will be finished with high-quality vinyl flooring suitable for wet areas, laid on a properly prepared and levelled subfloor. We will install a new inline extractor fan ducted to the external wall, wired to operate on a humidistat with a 15-minute overrun timer. Four recessed IP65-rated LED downlights will be installed to the ceiling. All edges, joints, and sanitaryware connections will receive a professional silicone seal in white to match the suite. Upon completion, the bathroom will be left clean, fully functional, and ready for use.

Cost Breakdown

Description Qty Unit Price Total
Strip Out & Disposal 1 £800.00 £800.00
Plumbing First Fix & Pipework 1 £2,400.00 £2,400.00
Sanitaryware Supply & Fit 1 £1,950.00 £1,950.00
Tiling & Floor Covering 1 £1,800.00 £1,800.00
Electrics & Finishing 1 £550.00 £550.00
Subtotal: £8,500.00
VAT (20%): £1,700.00
Total: £10,200.00

Estimated Timeline

The bathroom renovation is estimated to take 2–3 weeks from start to completion. Days 1–2 — Strip out of existing suite, tiles, and flooring; disposal of waste. Days 3–4 — Plumbing first fix: repositioning waste pipes and supply pipework to suit the new layout; any necessary floor levelling. Days 5–7 — Installation of shower bath, toilet, and vanity unit; connection of heated towel rail. Days 8–10 — Wall tiling (floor-to-ceiling) and vinyl floor installation. Days 11–12 — Electrical second fix: extractor fan and LED downlights; silicone sealing throughout. Day 13 — Final checks, snagging, and clean-up. Timescales assume tiles and sanitaryware are available and on site before commencement. We will confirm material lead times upon acceptance of this proposal.

Terms & Conditions

Payment Schedule: 20% deposit upon acceptance of this proposal. 40% upon completion of plumbing first fix and pipework. 40% final balance upon completion and handover. All payments are due within 7 days of invoice by bank transfer.

Warranty: AquaFlow Plumbing provides a 12-month warranty on all workmanship from the date of completion. Manufacturer warranties apply to all sanitaryware and fittings supplied by us. This warranty does not extend to damage caused by misuse, third-party interference, or limescale build-up.

Validity: This proposal remains valid for 30 days from the date above. Prices are based on current material costs and may be subject to adjustment thereafter. Any changes to the agreed scope of work will be quoted and confirmed in writing before being carried out.

Full House Rewire — 3 Bed Semi-Detached

Electrician £5,040.00

Spark Electrical Co

Unit 5 Trade Estate, Birmingham B15 3HJ
0121 345 6789
jobs@sparkelectrical.co.uk

PROPOSAL

Ref: QS-260220-089   Date: 20 February 2026

Client Details

Name: Mr David & Mrs Karen Hughes Email: david.hughes@email.com Phone: 07888 654321 Address: 31 Elm Street, Solihull B92 7LP

Scope of Work

We propose a complete rewire of the 3-bedroom semi-detached property at the above address, bringing the entire electrical installation up to the current BS 7671 18th Edition Wiring Regulations. The existing wiring, consumer unit, and accessories will be fully removed and replaced. A new dual RCD split-load consumer unit will be installed at the existing intake position, providing full RCD protection to all circuits as required by current regulations. New circuits will include ring final circuits for ground floor and first floor sockets, dedicated radial circuits for the kitchen, a 32A cooker circuit, a 40A shower circuit, and separate lighting circuits for each floor. All cable runs will be in twin-and-earth or appropriate cable types, routed through the loft space, under floorboards, and chased into walls where necessary, all clipped and supported to regulation standards.

The completed installation will comprise 14 double socket outlets and 2 single socket outlets positioned to suit the client's requirements, 12 ceiling light points with new pendant fittings (client to supply light shades), 2 external bulkhead lights (1 front, 1 rear), mains-interlinked smoke alarms fitted to the hallway, landing, and kitchen in compliance with current regulations, a new 32A cooker connection point, and a new 40A electric shower supply. Upon completion, we will carry out full testing and inspection of the installation, issue an Electrical Installation Certificate (EIC), and provide a satisfactory Electrical Installation Condition Report (EICR). All chases cut into walls will be made good with bonding plaster, left ready for the client's decorator to skim and paint. We will notify the local Building Control body of the works via our Part P self-certification scheme membership.

Cost Breakdown

Description Qty Unit Price Total
Consumer Unit & Main Intake 1 £950.00 £950.00
First Fix Wiring & Cable Runs 1 £1,800.00 £1,800.00
Accessories, Socket & Switch Plates 1 £550.00 £550.00
Testing, Certification & EICR 1 £450.00 £450.00
Making Good & Decoration Allowance 1 £450.00 £450.00
Subtotal: £4,200.00
VAT (20%): £840.00
Total: £5,040.00

Estimated Timeline

A full house rewire of this size is estimated to take 5–7 working days. Day 1 — Isolation of existing supply, removal of old consumer unit and wiring, installation of temporary supply for essential circuits. Days 2–3 — First fix: lifting floorboards, running new cable routes through loft and floor voids, chasing walls for socket and switch positions, installing back boxes. Days 4–5 — Second fix: fitting the new consumer unit, terminating all circuits, installing socket and switch faceplates, light fittings, smoke alarms, cooker and shower connections. Day 6 — Full testing and inspection of all circuits, dead testing, live testing, earth fault loop impedance, RCD trip times, and insulation resistance. Day 7 — Making good of all chases with bonding plaster, final clean-up, issue of Electrical Installation Certificate and EICR, handover to client. We will arrange for the electricity to be off during working hours on first fix days and will always restore power at the end of each working day.

Terms & Conditions

Payment Schedule: 25% deposit upon acceptance of this proposal. 50% upon completion of first fix wiring. 25% final balance upon completion, testing, and issue of certification. All invoices are payable within 7 days by bank transfer.

Warranty: Spark Electrical Co provides a 6-year warranty on all installation work from the date of the Electrical Installation Certificate. This covers any defects in workmanship or materials supplied by us. All accessories and the consumer unit carry their respective manufacturer warranties in addition to our installation guarantee. This warranty does not cover damage caused by third-party interference, water ingress, or acts of God.

Certification: An Electrical Installation Certificate (EIC) will be issued upon satisfactory completion and testing. A copy will be provided to the client and to the local authority Building Control body via our Part P competent person registration. An EICR (Electrical Installation Condition Report) confirming a satisfactory result will also be provided for your records.